Customization: | Available |
---|---|
Type: | Power |
Structure: | Gas-Insulated |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.IEC 62271-200 High-voltage switchgear and controlgear-Part 200:AC metal-enclosed
Switchgear and controlgear for rated voltages above 1kV and up to and including 52kV
2.GB3906-2006 Alternating-current metal-enclosed switchgear and controlgear for rated voltages above 3.6kV and up to and including 40.5kV
3.GB1984-2003 High-voltage alternating-current circuit-breaker
4.JB/T3855-2008 High-voltage alternating-current vacuum circuit-breaker
5.GB16926-2009 High-voltage alternating current switch-fuse combinations
6.GB3804-2004 High-voltage alternating-current switches for rated voltage above 3.6kV and less than 40.5kV
All parts of primary high-voltage circuit are wholly enclosed in a welded cabinet of 3mm-thickness stainless steels. The SF6 gas at 0.04MPa is filled as arc-extinguishing and insulating medium. Monitor the pressure of gas with air gauge. The back of gas chamber is equipped with explosion-proof device. When the arc pressure is too high, the high-pressure gas in the cabinet triggers the explosion-proof device and is released behind the cabinet to protect the safety of operators.
Our load switch adopts the structure of gas compression and inwards arc blowing. It has the strong arc quenching force and has no influence on the insulation between phase and to the ground. The dynamic and static contacts are arcing contacts to increase breaking times greatly.
A fuse and a load switch chamber comprise a transformer protection circuit. A high-voltage current-limiting fuse is mounted in the epoxy-cast insulated housing. After the fuse burns, it triggers the pin and causes the load switch to open.
An actuation chamber is in the front of ring main unit. In each functional circuit, load switch and breaker are equipped with manually/electrically-operated energy storage spring actuator while 3-position isolating switch and earth switch is equipped with manually-operated energy storage spring actuator. On the panel is a display of switch status. An interlocking mechanism connects load switch, earth switch and door of cable chamber, and breaker, 3-position isolating switch and door of cable chamber respectively.
XGNS1 is a series of small metal-clad switchgears. In a SF6 insulation chamber, it can integrate at most four modules. Provide 10 configurations for distribution network and adapt to most ring network applications. Its typical configurations include Def, CCF, CCCF, CCFF, CCC, CCCC, DeV, CCV, CCCV amd CCVV. If more than 4 modules are required in a switchgear, connect switchgears with expansion busbar to shape a semi-modular structure or connect all modules with expansion busbar for modular configuration.
Q: Could I have prices of your products?
A: Welcome. Please feel free to send us inquiry here. We will reply you within 24 hours
Q: Can l get a sample before the bulk order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q: Can we print our logo/ company name on products?
A: Yes, of course, we accept OEM, then need you to provide brand authorization to us
Q:Do you accept product customization?
A: Yes, of course, please provide specific drawings or parameters, we will quote you after evaluation
Q: What is the lead time?
A: The lead time depends on the quantities ordered, generally within 7-20 days after receiving the payment.
Q: What is your Trade Terms?
A: We accept EXW, FOB, CIF, FCA, etc.
Q: What is your payment method?
A: We accept T/T, Western Union, Paypal, irrevocable L/C at sight, etc
Q: Do you inspect the finished products?
A: Yes, each step of production and finished products wil be came out inspection by Qc department before shipping. And we willprovide goods inspection reports for your reference before shipment
Q: How to solve the quality problems after sales?
A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.